Dry-In Complete!

Finally!  After 11 weeks (original estimate was 4), the cabin dry-in is complete.  We were able to get the first floor log washed and borate treatment done – need to do the back and the second story when we get a tall ladder, then stain it all.  This weekend we need to continue site clean-up and install the door locks on all four doors.  The power folks ran the cable and cleared the trees 😦  to place two poles on either side of the stream – hopefully the land can start to heal now and stuff can start to grow back.  Now we just need power, then the well pump and Kenny may come back in 2-3 weeks to do the electrical and plumbing rough-in.

This slideshow requires JavaScript.

Advertisements

About juantana

SQL Server DBA working for the Federal gov't and enjoying life in the nation's capital. I enjoy sailing, hiking, camping, kayaking, biking, travel, museums, technology and wine.
Gallery | This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s