Dry-In Complete!

This gallery contains 15 photos.

Finally!  After 11 weeks (original estimate was 4), the cabin dry-in is complete.  We were able to get the first floor log washed and borate treatment done – need to do the back and the second story when we get … Continue reading

Gallery | Leave a comment

Cabin Construction – Week Nine

This week saw the roof get put on as well as the windows installed! Looks really great and I have also paid for the woodstove so that should be coming soon – we are in the home stretch and all … Continue reading

Posted in Uncategorized | Leave a comment

Cabin Construction – Week Eight

Not alot done construction-wise this week as they had alot of rain (story of the summer) – however we did get the excavator back out to connect the septic tank to the house and dig the trench for the well … Continue reading